更新时间:09-23 上传会员:陈老师
分类:环境科学 论文字数:26738 需要金币:1000个
摘要:本案例分析是对某制药厂进行环境影响评价。首先,在工程分析的基础上,估算出污染物的排放量,拟定合理的解决措施,再对本项目区域内的环境现状做出简要分析评价,以进一步确定项目的建设对本区域环境的影响程度。最后,重点对水、气、声、渣的环保措施的处理结果做出分析,从而确定项目的建设是否对本地区环境产生不良影响,得出结论,以有利于帮助确定规划项目在本区域内能否有效施行,从而达到合理利用本地资源和保护环境的效果。
关键词:环境影响评价 废水 废气 废渣 噪声 处理措施
Abstract:The analysis of this case is an assessment of the environmental effects in some pharmaceutical factory. Firstly, on the basis of engineering analysis, the quantity discharged of contaminants can be estimated. Then, after reasonable measures being drawn up, a brief analysis and assessment of the existing environment within the project area could be made. Finally, focus should be paid on the analysis of the results of environmental protecting measures towards waste water, ai, noise and residue. Therefore, whether the construction of the project has harmful effects on local environment can be certified. As the conclusion is helpful for deciding whether the scheduled project can be effectively carried out in local area, the effects of environmental protection and making good use of local resources could be realized.
Key words: assessment of environmental effects, waste water, waste gas, waste residue, noise, processing measures
通过对工程项目的工程分析、同类项目及新旧项目的类比调查,确定建设项目各生产过程中的污染源特征,主要污染物及其发生量,以及实施污染治理措施后的污染物排放分析。论证环境保护措施的可行性,提出进一步控制和缓解污染影响的对策和建议,供项目的设计和建设过程参考。